Become a community

creator

In Summer 2025, we are inviting villagers and friends to join us in building a uniqe community space in CPH Village Østerbro.

Join us and….

Learn how to build a house!

Meet a lot of your neighbors

See a new way of creating cities

We believe we can raise the building in 23 days—with the help of committed citizens like you!

You can join one or more of the days. We will be a group of 3-4 people each day.

Here’s is the draft program.

  1. Foundations (screws) - done

  2. Foundations (connections) - done

  3. Floor (beams) - Wed. 4 June

  4. Floor (joists) - Thur. 5 June

  5. Installations (wiring) - Fri. 6 June

  6. Structure (columns and diagonal braces) - Wed. 12 June

  7. Roof (roof beams) - Thu. 13 June

  8. Roof (rafters) - Fri 14 jun

  9. Walls (hempcrete) - Tue. 17 June

  10. Walls (hempcrete) - Wed. 18 June

  11. Walls (hempcrete) - Thu. 19 June

  12. Walls (hempcrete)+ Roof (battens, Insulation & toproof) - Friday 20 Jun - Fri. 20 June

  13. Roof - (battens, Insulation & toproof) - Mon 23 Jun

  14. Walls (hempcrete) - Tue . 24 June + Roof - (underroof + prepare for steel roof)

  15. Walls (hempcrete) - Thu. 26 Jun

  16. Walls (hempcrete) & Roof (steel sheeting) - Fri. 27

  17. Walls (render) - TBA

  18. Windows (prepare) - Thu. 10 July

  19. Windos (install) - Fri. 11 July

  20. Roof (gypsum) - Mon. 28 July

  21. Floor (final surface) - TBA

  22. Installation (sockets) - TBA

  23. Buffer day

    Finish party / “WE DID IT gilde” - Fri. 29 August

    Villagers Opening event - Thu. 11 September

Program

The Dream

We believe more people should have the opportunity to take a more direct part in shaping the cities, the neighborhoods, and the spaces they live in—especially the shared ones that bring us together.

That’s why we’re working on a building system that makes it simple to design, order, and assemble your own buildings. No special skills required—just a desire to take part.

The first building created this way will be built together with the community in Village Østerbro this summer.

It’s a first step toward a future where building your surroundings isn't reserved for experts—but open to everyone who wants to take part.

From idea to blueprint

Nerd alert.

To turn dream into reality, we’ve joined forces with top engineers who translate your designs into fully functional blueprints—complete with statics, fire safety, and a detailed materials list.


Robot, chop chop

Our design engine is connected to these two robots that are located in Århus.

They cut, prepare, and package every single piece—ready for human hands to bring it all together.

The result? A ready-to-assemble building kit, made to be built by a community.

And yes—we’ve already hit “order” for the Østerbro building.

Your role

For each working day we need minimum 5 persons. All will be doing multiple assembly task during the day, but you may also be given one of the following special roles that we will train you in:

Site master

Throughout the day, you will make sure that the building site is neat and tidy and that safety measures are upheld. Also that we cover materials with tarpaulins in case of rain.

Manual master

Throughout the day, you will be in charge of the assembly manual we have made and know what the next step is. You will clarify any questions with our backend engineers. and communicate with the team.

Measure master

Throughout the day, you will check that measures are as described in the manual

Good vibes master

Throughout the day, you will make sure there is music, food and good vibes! You will also document the process with video and photos.

Want to join?

No experience is requred for this project. Just a willingness to show up, work a full day or more, and help build the future

Sign up and our co-founder Michael Plesner will keep you posted with program updates.